Facebook

Pulling Stumps (Clean-up) on Burt Rd. between Lincoln & M-13 in Albee Twp

Grading Gravel Roads in the following Townships: Marion, St. Charles, Brant & Spaulding.

Hot Patching in Tittabawassee Twp.

Placing Gravel at the following locations:
1. Grabowski Rd. between Chapin & Steel in Fremont Twp.
2. Oakley Rd. between Hanchett & Schroeder in Brant Twp.
3. Schomaker Rd. between M-52 & Gleaner in Thomas Twp.

Brining Gravel Roads in Brant Twp. & Brady Twp.

Catch Basin Cleanout & Storm Drain Cleaning
1. Reese Rd. between Busch & Rathbun in Birch Run Twp.
2. Fordney Rd. south of Lunny in Richland Twp.
3. Briggs Rd. south of Chesaning in Maple Grove Twp.
4. Routine Maintenance in Carrollton Twp.

Road Patching on Gasper Rd. in Chesaning Twp.

Sweeping (2 Sweepers)
1. Primary Roads south of M-58 in Saginaw Twp.
2. Subdivisions north of M-58 in Saginaw Twp.

Brush Cutting in Albee Twp.

Crack Sealing in Kochville Twp. (Weather Permitting).

Roadside Mowing in the following Townships: Tittabawassee, Fremont, Taymouth, Birch Run, Carrollton, Lakefield, Frankenmuth & Marion.

Taking Care of Clear Vision Obstructions in Carrollton Twp.

Pothole Patching Countywide (Multiple Crews).

Equipment Maintenance - Servicing & Repairing.

Sign Shop
1. Updating Signs in Thomas Twp.
2. Countywide Sign Maintenance.
... See MoreSee Less

13 hours ago  ·  

View on Facebook

Grading Gravel Roads (Prepping for Brine) in Brant Twp.

Placing Gravel at the following locations:
1. Schroeder Rd. between Fordney & Oakley in Brant Twp.
2. Oakley Rd. between Schroeder & Hanchett in Brant Twp.
3. Brennan Rd. between Schroeder & Colvin in Brant Twp.
4. Brennan Rd. between Townline & Grabowski in Fremont Twp.

Brining Gravel Roads in Brant Twp. & St. Charles Twp.

Ditching & Drainage Repairs
1. Reese Rd. between Busch & Rathbun in Birch Run Twp.
2. Walnut Rd. & Madison Rd in Carrollton Twp.

Shoulders Maintenance in Taymouth Twp. & Birch Run Twp.

Hydro-Seeding in the following Townships: Brant, Tittabawassee, Birch Run, Bridgeport & Taymouth.

Road Patching in Swan Creek Twp.

Sweeping (2 Sweepers)
1. Primary Roads south of M-58 in Saginaw Twp.
2. Subdivisions north of M-58 in Saginaw Twp.

Brush Cutting on Hawkins in Albee Twp.

Roadside Mowing in the following Townships: Tittabawassee, Fremont, Taymouth, Birch Run, Carrollton & Lakefield.

Crack Sealing
1. Mackinaw Rd. between Weiss Rd. & Tittabawassee Rd. in Saginaw Twp.
2. Kochville Rd. between Bay Rd. (M-84) & Westervelt in Kochville Twp./Zilwaukee Twp.

Pothole Patching Countywide (Multiple Crews).

Equipment Maintenance - Servicing & Repairing.

Sign Shop
1. Updating Signs in Thomas Twp.
2. Countywide Sign Maintenance.
... See MoreSee Less

2 days ago  ·  

View on Facebook

Cross Culvert Replacement on Courtney Rd.@ Moorish Rd. in Taymouth Twp.

Pulling Stumps (Clean-up) on Burt Rd. between Lincoln & M-13 in Albee Twp.

Grading Gravel Roads (Prepping for both Gravel & Brine) in the following Townships: Marion, St. Charles, Brant & Lakefield.

Hot Patching in Carrollton Twp.

Placing Gravel at the following locations:
1. Burt Rd. between Hemlock & Raucholz in Brant Twp.
2. Raucholz Rd. between Marion & Brant in Brant Twp.
3. Brennan Rd. between Schroeder & Colvin in Brant Twp.

Brining Gravel Roads in Brant Twp. & St. Charles Twp.

Ditching on Curve Rd between Graham and Tittabawassee in Thomas Twp.

Shoulders Maintenance in Richland Twp. & Thomas Twp.

Catch Basin Cleanout & Storm Drain Cleaning
1. Sheffield Rd. in Saginaw Twp.
2. Chipping Norton in Saginaw Twp.

Road Patching on Gasper Rd. in Chesaning Twp.

Sweeping (2 Sweepers)
1. Primary roads south of M-58 in Saginaw Twp.
2. Subdivisions north of M-58 in Saginaw Twp.

Brush Cutting in Albee Twp.

Crack Sealing
1. Weiss Rd. between M-47 & Mackinaw Rd. in Saginaw Twp.
2. Mackinaw Rd. between Weiss Rd. & Tittabawassee Rd. in Saginaw Twp.

Roadside Mowing in the following Townships: Tittabawassee, Fremont, Taymouth, Birch Run, Carrollton & Lakefield.

Pothole Patching Countywide (Multiple Crews).

Equipment Maintenance - Servicing & Repairing.

Sign Shop
1. Updating Signs in Thomas Twp.
2. Countywide Sign Maintenance.
... See MoreSee Less

3 days ago  ·  

View on Facebook

Status for Engineering Department Construction Projects:
Monday, May 23, 2016

Federal Aid Project‐ Gary Road Bridge over the Shiawassee River - Location: Between Corunna Road and Sharon Road on the St. Charles Twp./Chesaning Twp. line. Description of Work: Remove & Replace existing with Concrete I‐ Beam Structure and Approaches. Contract awarded to Davis Construction of Lansing, Michigan. Work began on 01/04/2016. Existing bridge and road closed between Sharon and Corunna. Detour Route in place. Project is currently on schedule to be open for traffic: and completed by July 15, 2016. Roadwork storm sewer on the west side will be complete today. After sewer is complete Davis will work on embankment and building the road on the west side. Roadway approaches and storm sewer must be completed by July 1 to be ready in time for paving. Superstructure Work.
Storm sewer on the west side will be complete today. After sewer is complete Davis will work on embankment and building the road on the west side. The wet cure on the deck will be complete tomorrow. False work for the deck is being removed as the
deck has attained both 5 days and 70% strength. No work on the east side will start until the road work on the west is complete.

Upcoming Federal Aid Project ‐ Morseville Road Bridge over the Silver Creek - Location: Between E. Rathbun Rd. & Canada Rd. in Taymouth Twp. Description of Work: Remove & Replace existing with Concrete I‐Beam Structure and Approaches.
Status: Final stage designs submitted to MDOT. Project is scheduled for a July Letting. Construction Schedule: Start work August, 2016. Open to Traffic: November 23, 2016. Final completion June 2, 2017.

Upcoming Federal Aid Project‐ Curtis Road Bridge over the Dead Creek - Location: Between Maple and Beyer Roads in Frankenmuth Twp. Description of Work: Remove & Replace existing with Concrete I‐Beam Structure and Approaches.
Construction Schedule: Proposed bid date: June 3, 2016. Start work: July 5. Open to Traffic: October 21, 2016. Final completion: June 2, 2017.

Upcoming Federal Aid Project ‐ Hemmeter Road Reconstruction -
Location: Between Brockway and State in Saginaw Twp.
Description of Work: Road reconstruction and widening with earthwork, drainage, sand and aggregate base courses, concrete curb & sidewalk ramps, HMA paving and clean up. Construction Schedule: Proposed bid date: June 3, 2016. Start work July 5, 2016. Open to Traffic: September 30, 2016. Final completion November 23, 2016.

Upcoming Federal Aid Project‐ Peet Road Bridge over the Lamb Creek - Location: Between Steel and Fowler Roads in Sections 18 & 19 Brady Twp . Description of Work: Remove & Replace existing with Concrete I‐Beam Structure and Approaches.
Status: Final stage designs submitted to MDOT. Project is scheduled for a July Letting. Construction Schedule: Start work August, 2016. Open to Traffic: November 23, 2016. Final completion June 2, 2017.

Upcoming Local Project: 2016 Shattuck and Shattuckville
Road Surfacing and Speed Tables - Located along Shattuck and Shattuckville from Hospital to Midland Road in Saginaw Township
Status: Final Stage design. Description of Work: 0.60 miles of hot mix asphalt surface and speed tables. Over 0.25 miles from Midland Road to the proposed Speed Table (from STA 32+75 to 15+75) additional asphalt and a geo‐composite interlayer grid has been included to repair damage to pavement over the winter.
Construction Schedule: Proposed bid date: June 2, 2016. Start work June 14, 2016. Completion September 2, 2016.

Upcoming Local Project: HMA Resurfacing along Chipping Norton Court and Pebworth Place - Located along south of McCarty Road in Saginaw Twp. Status: Final Stage design. Construction Schedule: Proposed bid date: June 2, 2016. Start work July 5, 2016. Completion by September 2, 2016.

Upcoming Local Project: 2016 Concrete Pavement Repairs
Located along various locations in Saginaw Twp. and Carrollton Twp. Status: Final Stage design. Description of Work: Concrete pavement patching. Construction Schedule: Proposed bid date: June 13, 2016. Start work June 20, 2016. Completion by
September 12, 2016.
... See MoreSee Less

3 days ago  ·  

View on Facebook

Additional Maintenance Work scheduled for Monday, May 23rd
Crack Sealing in Saginaw Twp. at the following locations:
1. Hospital Rd. south of Tittabawassee Rd.
2. Mannion Rd. between Shattuck Rd. & McCarty Rd.
... See MoreSee Less

4 days ago  ·  

View on Facebook

Cross Culvert Replacement on Nott Rd. between Blackmar & Fort in Bridgeport Twp.

Pulling Stumps (Clean-up) on Burt Rd. between Lincoln & M-13 in Albee Twp.

Grading Gravel Roads (Prepping for both Gravel & Brine) in the following Townships: Marion, St. Charles, Chapin & Brant.

Shoulders Maintenance in the following Townships: Tittabawassee, Swan Creek, James & Thomas.

Catch Basin Cleanout & Storm Drain Cleaning
1. 31st St.@ Norman in Buena Vista Twp.
2. Curtis Rd. between Cole & Sheridan in Bridgeport Twp.
3. Routine Maintenance in Carrollton Twp.

Road Patching on Gasper Rd. in Chesaning Twp.

Sweeping
1. Subdivisions in Bridgeport Twp.
2. Subdivisions north of M-58 in Saginaw Twp.

Brush Cutting in Albee Twp.

Roadside Mowing in the following Townships: Tittabawassee, Richland, Spaulding, Birch Run & Carrollton.

Pothole Patching Countywide (Multiple Crews).

Equipment Maintenance - Servicing & Repairing.

Sign Shop
1. Updating Signs in Thomas Twp.
2. Countywide Sign Maintenance.
... See MoreSee Less

4 days ago  ·  

View on Facebook

Ditching (Storm Drain Maintenance)
1. Airport Rd. between Roedel & McGrandy in Bridgeport Twp.
(Tile Jetting also).
2. Raucholz Rd. south of Peet in Brady Twp. (Tile Jetting also).
3. Pretzer Rd. between Swan Creek and Ederer in Fremont Twp.
4. Beyer Rd. between Townline & Lange in Birch Run Twp. (Tile Jetting also).

Pulling Stumps (Clean-up) on Burt Rd. between Lincoln & M-13 in Albee Twp

Grading Gravel Roads (Prepping for both Gravel & Brine) in the following Townships: Marion, St. Charles & Chapin.

Shoulders Maintenance in Saginaw Twp.

Placing Gravel at the following locations:
1. Raucholz Rd. between Niblok Rd. & W. Burt Rd. in Brant Twp.
2. Burt Rd. from Oakley to the east in Brant Twp.

Brining Gravel Road in Marion Twp. & Chapin Twp.

Road Patcher on Peet in Chesaning Twp.

Sweeping
1. Subdivisions in Bridgeport Twp.
2. Subdivisions north of M-58 in Saginaw Twp.

Brush Cutting in Albee Twp.

Roadside Mowing in the following Townships: Tittabawassee, Chesaning, Spaulding, Birch Run & Carrollton.

Pothole Patching Countywide (Multiple Crews).

Equipment Maintenance - Servicing & Repairing.

Sign Shop
1. Updating Signs in Birch Run Twp..
2. Countywide Sign Maintenance.
... See MoreSee Less

1 week ago  ·  

View on Facebook

Ditching (Storm Drain Maintenance)
1. Townline Rd. between Pettit & Marshall in Bridgeport Twp./ Taymouth Twp.
2. Raucholz Rd. south of Peet in Brady Twp.

Pulling Stumps Burt Rd. between Lincoln & M-13 in Albee Twp

Grading Gravel Roads (Prepping for both Gravel & Brine) in the following Townships: Marion, Brant, Albee, St. Charles, Brady & Chapin.

Placing Gravel on Burt Rd. from Oakley Rd. to the east in Brant Twp.

Road Patching on Peet Rd. in Chesaning Twp.

Tile Jetting
1. Lunny Rd. @ Brennan Rd. in Richland Twp.
2. Tittabawassee Rd. of Diener Rd. in Richland Twp.
3. Townline Rd. @ M-83 in Birch Run Twp.
4. Swan Creek Rd. between Miller & River in James Twp.

Sweeping
1. Subdivisions in Bridgeport Twp.
2. Subdivisions in Spaulding Twp.
3. North of M-58 in Saginaw Twp.

Brush Cutting in Albee Twp.

Roadside Mowing in the following Townships: Tittabawassee, Chesaning, Spaulding, Birch Run & Carrollton.

Pothole Patching Countywide (Multiple Crews).

Equipment Maintenance - Servicing & Repairing.

Sign Shop
1. Updating Signs in Birch Run Twp.
2. Railroad Cross-Buck Maintenance.
... See MoreSee Less

1 week ago  ·  

View on Facebook

Ditching (Storm Drain Maintenance)
1. Townline Rd. between Pettit & Marshall in Bridgeport Twp./ Taymouth Twp.
2. Ederer Rd. between Pretzer and Raucholz in Fremont Twp

Cross Culvert Replacement on Raucholz Rd. between Gary & Baldwin in Brady Twp.

Pulling Stumps
1. Ederer Rd. between Pretzer & Raucholz in Fremont Twp.
2. Burt Rd. between Lincoln & M-13 in Albee Twp

Grading Gravel Roads (Prepping for both Gravel & Brine) in the following Townships: Lakefield, Brant, Albee & Maple Grove.

Placing Gravel at the following locations:
1. McKeighan Rd. from Sharon Rd. south to pavement in St. Charles Twp.
2. Amman Rd. between M-57 & Chesaning in Chesaning Twp.

Road Patcher on Peet Rd. in Chesaning Twp.

Tile Jetting (Cleaning) at the following locations:
1. Hetzner Rd. west off of Hermansau in Saginaw Twp.
2. Starlite Rd. off Hermansau in Saginaw Twp.
3. Townline Rd. @ M-83 in Birch Run Twp.
4. Airport Rd. between Roedel & McGrandy in Bridgeport Twp.
5. 31st St. off Norman in Buena Vista Twp.
6. Swan Creek Rd. between Miller & River in James Twp.
7. Ederer Rd. between Gleaner & Orr in Swan Creek Twp.
8. Roosevelt Rd. between M-52 & Stello in Swan Creek Twp.

Hydro-Seeding
1. Hackberry Rd. off Williamson in Bridgeport Twp.
2. Townline Rd. between Marshall & Pettit in Bridgeport Twp.

Sweeping
1. Subdivisions in Bridgeport
2. Subdivisions in Spaulding Twp.
2. Subdivisions north of M-58 in Saginaw Twp.

Brush Cutting in Albee Twp.

Mowing in Tittabawassee Twp.

Pothole Patching Countywide (Multiple Crews).

Equipment Maintenance - Servicing & Repairing.

Sign Shop
1. Updating Signs in Birch Run.
2. Countywide Sign Maintenance.
... See MoreSee Less

1 week ago  ·  

View on Facebook

Status for Engineering Department Construction Projects:
Monday, May 16, 2016

Federal Aid Project‐ Gary Road Bridge over the Shiawassee River. Location: Between Corunna Road and Sharon Road on the St. Charles Twp./Chesaning Twp. Description of Work: Remove & Replace existing with Concrete I‐ Beam Structure and Approaches. Contract awarded to Davis Construction of Lansing Michigan. Work began on 01/04/2016. Existing bridge and road closed between Sharon and Corunna. Detour Route in place. Project is currently on schedule to be open for traffic and completed by July 15, 2016. Roadwork - Storm sewer and work on road approaches to bridge begins this week. Roadway earthwork and storm sewer was scheduled to be completed by May 18 but must be completed by July 1 to be ready in time
for paving. Superstructure Work - Deck pours completed last week. 7 day wet cure of concrete to continue this week. Crew setting up concrete screeds and rails in preparation for concrete deck pour.

Upcoming Federal Aid Project ‐ Morseville Road Bridge over the Silver Creek - Location: Between E. Rathbun Rd. & Canada Rd. in Taymouth Twp. Description of Work: Remove & Replace existing with Concrete I‐Beam Structure and Approaches.
Status: Final stage designs submitted to MDOT. Project is scheduled for a July Letting. Proposed Construction Schedule: Start work August, 2016. Open to Traffic: November 23, 2016. Final completion June 2, 2017.

Upcoming Federal Aid Project‐ Curtis Road Bridge over the Dead Creek. Location: Between Maple and Beyer in Frankenmuth Twp.
Description of Work: Remove & Replace existing with Concrete I-Beam Structure and Approaches. Bid Letting scheduled for: June 3, 2016. Proposed Construction Schedule: Start work: July 5. Open to Traffic October 21, 2016. Final completion: June 2, 2017.

Upcoming Federal Aid Project‐ Hemmeter Road Reconstruction
Location: Between Brockway and State in Saginaw Twp.
Description of Work: Road reconstruction and widening with earthwork, drainage, sand and aggregate base courses, concrete curb & sidewalk ramps, hma paving and clean up. Bid Letting scheduled for: June 3, 2016. Proposed Construction Schedule: Start work July 5, 2016. Open to Traffic: September 30, 2016. Final completion November 23, 2016.

Upcoming Federal Aid Project‐ Peet Road Bridge over the Lamb Creek. Location: Between Steel and Fowler in Sections 18 & 19 Brady Twp. Description of Work: Remove & Replace existing with Concrete I‐ Beam Structure and Approaches. Status: Final stage designs submitted to MDOT. Project is scheduled for a July Letting. Proposed Construction Schedule: Start work August, 2016. Open to Traffic: November 23, 2016. Final completion June 2, 2017.

Upcoming Local Project: 2016 Shattuck and Shattuckville
Road Surfacing and Speed Tables. Located along Shattuck and Shattuckville from Hospital to Midland Road in Saginaw Township
Status: Final Stage design. Description of Work: 0.60 miles of hot mix asphalt surface and speed tables. Over 0.25 miles from Midland Road to the proposed Speed Table (from STA 32+75 to 15+75) additional asphalt and a geo‐composite interlayer grid has been included to repair damage to pavement over the winter.
Construction Schedule: Start work June, 2016. Completion September, 2016.