To our traveling motorist: Please respect our flaggers' traffic control directions when we are working within a particular mile or ½ mile. If your residence is within the closed area you will be allowed to go through, but all thru traffic will be asked to go around. This will help us to complete each mile ASAP and minimize any unfortunate mishaps.

Chip Seal Locations:
1. Lincoln Rd. between M-57 & Johnstone in Maple Grove Twp.
2. Amman Rd. between M-57 & Ferden in Chesaning Twp.
3. Ditch Rd. between Corunna & Frandsche in Chesaning Twp.
4. Frandsche Rd. between Peet & M-57 in Chesaning Twp.
5. Hampton, Andress & Abingdon south of Volkmer & east of Main in the Village of Chesaning (Note: If Time & Material Allows)

Post Chip Seal Sweeping (Scheduled Order)
1. Birch Run Rd. between Sheridan & Bueche in Albee Twp.
2. Birch Run Rd between Lincoln & Bishop in Albee Twp.
3. Gary Rd. between Lincoln & Sheridan in Albee Twp./ Maple Grove Twp.
4. Chesaning Rd. between Lincoln & Sheridan in Maple Grove Twp
5. Lincoln Rd. between Gary & M-57 in Maple Grove Twp.

Surface Maintenance (Filling Ruts using Seal Blend Material)
1. Courtney Rd. off of Morseville in Taymouth Twp.
2. Cimarron Dr. north of Burt Rd. in Birch Run Twp.
3. Washington Rd. between Studor & Sheridan in Bridgeport Twp.
4. Pear in Genesee Gardens Subdivision in Bridgeport Twp.

Crack Sealing at the following locations:
1. Dresden Ct. Subdivision in Buena Vista Twp.
2. Diamondale Subdivision in Bridgeport Twp.

Roadside Mowing int he following Townships: Blumfield, Taymouth, Albee, Fremont, Chapin, Thomas & Tittabawassee.

Curb Sweeping north of M-58 in Saginaw Twp.

Pothole Patching Countywide.

Equipment Maintenance - Servicing & Repairing.

Sign Shop - Updating Signs in Taymouth Twp.
... See MoreSee Less

3 days ago  ·  

View on Facebook

Thank you to MMR for partnering with the Saginaw County Road Commission to secure grant funding to purchase AEDs for our facilities! ... See MoreSee Less

Congratulations to Saginaw County Road Commission on their FIVE new AEDs! The SCRC acquired three AEDs through the MMR matching grant program and purchased two additional units for their operations buildings in Saginaw County. MMR salutes SCRC on being proactive and contributing to a HeartSafe Community! Pictured are Lynn Schutter and Jenn Brin from MMR and Scott Hare from SCRC.

4 days ago  ·  

View on Facebook

To our traveling motorist: Please respect our flaggers' traffic control directions when we are working within a particular mile or ½ mile. If your residence is within the closed area you will be allowed to go through, but all thru traffic will be asked to go around. This will help us to complete each mile ASAP and minimize any unfortunate mishaps.

Chip Sealing Locations:
1. Gary Rd. between Lincoln & Sheridan in Albee Twp. / Maple Grove Twp.
2. Chesaning Rd. between Lincoln & Sheridan in Maple Grove Twp.
3. Lincoln Rd. between Gary & M-57 in Maple Grove Twp.


Post Chip Seal Sweeping (Scheduled Order)
1. Stern Rd. between Beyer & Dehmel in Frankenmuth Twp.
2. Burt Rd. between M-83 & Block in Birch Run Twp.
3. Dorwood Rd. between Birch Run & Burt in Taymouth Twp.
4. Birch Run Rd. between Sheridan & Bueche in Albee Twp.
5. Birch Run Rd between Lincoln & Bishop in Albee Twp.

Surface Maintenance (Filling Ruts using Seal Blend Material) in Bridgeport Twp. & Buena Vista Twp.

Ditch Cleaning in Tittabawassee Twp.
1. Mielke Rd. between Pierce & Wilkinson
2. Wilkinson Rd. between Gleaner & Mielke

Roadside Mowing in the following Townships: Blumfield, Taymouth, Albee, Fremont, Chapin & Thomas.

Tile Jetting (Cleaning)
1. 3885 Lawndale in Saginaw Twp.
2. 2280 N. Thomas Rd. in Thomas Twp.

Crack Sealing on Miller Rd. between Gratiot Rd. & Swan Creek Rd. in Thomas Twp.

Roadside Patching Countywide.

Equipment Maintenance - Servicing & Repairing.

Sign Shop - Updating Signs in Taymouth Twp.
... See MoreSee Less

4 days ago  ·  

View on Facebook

To our traveling motorist: Please respect our flaggers' traffic control directions when we are working within a particular mile or ½ mile. If your residence is within the closed area you will be allowed to go through, but all thru traffic will be asked to go around. This will help us to complete each mile ASAP and minimize any unfortunate mishaps.

Chip Seal Locations:
1. Dorwood Rd. between Birch Run & Burt in Taymouth Twp.
2. Birch Run Rd. between Sheridan & Bueche in Albee Twp.
3. Birch Run Rd between Lincoln & Bishop in Albee Twp.

Post Chip Seal Sweeping (Scheduled Order)
1. Baker Rd. between Portsmouth & Reimer in Bridgeport Twp.
2. Munger Rd. between Portsmouth & Fred in Buena Vista Twp.
3. Stern Rd. between Beyer & Dehmel in Frankenmuth Twp.
4. Burt Rd. between M-83 & Block in Birch Run Twp.

Surface Maintenance (Filling Ruts using Seal Blend Material)
1. Kimberly Dr. off of Airport in Bridgeport Twp.
2. Wadsworth Rd. between Towerline & I-75 in Buena Vista Twp.

Ditch Cleaning in Tittabawassee Twp.
1. Mielke Rd. between Pierce & Wilkinson
2. Wilkinson Rd. between Gleaner & Mielke

Roadside Mowing int he following Townships: Blumfield, Tittabawassee, Albee, Fremont, Chapin & Thomas.

Tile Jetting (Cleaning) in Saginaw Twp.
1. On Lawndale
2. On Mackinaw

Roadside Patching Countywide.

Equipment Maintenance - Servicing & Repairing.

Sign Shop
1. Replacing damaged Stop Signs at the following locations: Gera Rd. @ Hack Rd in Blumfield Twp. & Gasper Rd. @ Burt Rd. in Albee Twp.
2. Placing Loose Stone Sign in advance of planned Chip Seal route's in Thomas Twp.
3. Updating Signs in Taymouth Twp.
... See MoreSee Less

5 days ago  ·  

View on Facebook

Pre & Post Chip Seal Sweeping (Scheduled Order)
1. Lorraine between Schust & Flanders in Carrollton Twp.
2. Sally Ln. between Michigan & Lorraine in Carrollton Twp.
3. Lorraine between Tittabawassee & Savoy in Carrollton Twp.
4. Cadillac off Savoy in Carrollton Twp.
5. Savoy between Lorraine & Cadillac in Carrollton Twp.
6. Baker Rd. between Portsmouth & Reimer in Bridgeport Twp.

Hot Patching in Blumfield Twp.

Surface Maintenance (Filling Ruts using Seal Blend Material)
1. Watson Rd. between Gratiot & Doyle in Richland Twp.
2. Brennan Rd. between Doyle & Ederer in Richland Twp.
3. Iva Rd. between Doyle & Ederer in Richland Twp.
4. Geddes Rd. between Hemlock & Brennan in Richland Twp.

Crack Sealing
1. N. Thomas Rd. between Gratiot to Geddes in Thomas Twp.
2. Cemetery Dr. off River Rd. north of State in Thomas Twp.
3. Diamondale Subdivision in Bridgeport Twp.
4. Beyer Rd. between Baker & Junction in Frankenmuth Twp.
5. Dresden Ct. Subdivision in Buena Vista Twp.

Roadside Mowing in the following Townships: Blumfield, Carrollton, Albee, Fremont, Chapin & Richland.

Pothole Patching Countywide.

Equipment Maintenance - Servicing & Repairing.

Sign Shop
1. Sign Fabrication
2. Updating Signs in Taymouth Twp.
... See MoreSee Less

1 week ago  ·  

View on Facebook

To our traveling motorist: Please respect our flaggers' traffic control directions when we are working within a particular mile or ½ mile. If your residence is within the closed area you will be allowed to go through, but all thru traffic will be asked to go around. This will help us to complete each mile ASAP and minimize any unfortunate mishaps.

Chip Seal Locations:
1. Burt Rd. between M-83 & Block in Birch Run Twp.
2. Munger Rd. between Portsmouth & Fred in Buena Vista Twp.

Pre & Post Chip Seal Sweeping (Scheduled Order)
1. Adams Rd. between Schust & Tittabawassee in Zilwaukee
2. Sally Ln. between Michigan & Lorraine in Carrollton Twp.
3. Lorraine between Tittabawassee & Savoy in Carrollton Twp.
4. Cadillac off Savoy in Carrollton Twp.
5. Savoy between Lorraine & Cadillac in Carrollton Twp.
6. Lorraine between Schust & Flanders in Carrollton Twp.

Hot Patching in Buena Vista Twp.

Surface Maintenance (Filling Ruts using Seal Blend Material)
1. Gary Rd. Fowler to M-52 in Brady Twp.
2. Sarle Rd. between M-47 & Carter in Tittabawassee Twp.

Road Patching at the following locations:
1. Block Rd. between M-15 & Wadsworth in Blumfield Twp.
2. Cimarron off of Burt Rd. in Birch Run Twp.

Replacing Cross-Culvert on Brennan Rd. between Roosevelt & Spencer in Lakefield Twp.

Crack Sealing in Thomas Twp. at the following locations:
1. Brookfield Ct. west of Miller Rd. in Thomas Twp.
2. Westlawn Ct. west of Miller Rd. in Thomas Twp.
3. Winchester Ct. west of Miller Rd. in Thomas Twp.
4. Liskow Ct. west of Miller Rd. in Thomas Twp.
5. N. Thomas Rd. from Gratiot to Geddes in Thomas Twp.

Roadside Mowing in the following Townships: Frankenmuth, Carrollton, Albee, Fremont, Chapin & Richland.

Curb Sweeping north of M-58 in Saginaw Twp.

Pothole Patching Countywide.

Equipment Maintenance - Servicing & Repairing.

Sign Shop
1. Sign Fabrication
2. Updating Signs in Taymouth Twp.
... See MoreSee Less

1 week ago  ·  

View on Facebook

To our traveling motorist: Please respect our flaggers' traffic control directions when we are working within a particular mile or ½ mile. If your residence is within the closed area you will be allowed to go through, but all thru traffic will be asked to go around. This will help us to complete each mile ASAP and minimize any unfortunate mishaps.

Prepping Previously Crushed Rd. for Chip Seal
1. Burt Rd. between M-83 & Block in Birch Run Twp.
2. Munger Rd. between Portsmouth & Fred in Buena Vista Twp.

Pre & Post Chip Seal Sweeping (Scheduled Order)
1. Sherman Rd. between Kochville & Schust in Zilwaukee
2. Schust Rd. between Venoy & Adams in Zilwaukee
3. Adams Rd. between Schust & Tittabawassee in Zilwaukee
4. Sally Ln. between Michigan & Lorraine in Carrollton Twp.
5. Lorraine between Tittabawassee & Savoy in Carrollton Twp.
6. Cadillac Rd. off Savoy in Carrollton Twp.
7. Savoy Rd. between Lorraine & Cadillac in Carrollton Twp.
8. Lorraine Rd. between Schust & Flanders in Carrollton Twp.
9. Baker Rd. between Portsmouth & Reimer in Bridgeport Twp.
10. Stern Rd. between Dehmel & Beyer in Frankenmuth Twp.

Surface Maintenance (Filling Ruts using Seal Blend Material)
1. Fowler Rd. between Gary Rd. & Ridge Rd. in Brady Twp.
2. In Saginaw Twp.

Ditch Cleaning on East Rd. between Gary & Burt in Albee Twp.

Crack Sealing in Saginaw Twp. at the following locations:
1. Wayside St. south of Shattuck west of Mackinaw
2. Pacelli St. west Michigan to the north

Roadside Mowing in the following Townships: Frankenmuth, Taymouth, Brady, Saginaw, Maple Grove, Richland, Lakefield & Kochville.

Curb Sweeping north of M-58 in Saginaw Twp.

Pothole Patching Countywide.

Equipment Maintenance - Servicing & Repairing.

Sign Shop
1. Placing Loose Stone Signs in District 4 (northwest portion of the County).
2. Updating Signs in Spaulding Twp.
3. Updating Signs in Taymouth Twp.
... See MoreSee Less

2 weeks ago  ·  

View on Facebook

To our traveling motorist: Please respect our flaggers' traffic control directions when we are working within a particular mile or ½ mile. If your residence is within the closed area you will be allowed to go through, but all thru traffic will be asked to go around. This will help us to complete each mile ASAP and minimize any unfortunate mishaps.

Chip Sealing on Stern Rd. between Dehmel & Beyer in Frankenmuth Twp.

Pre & Post Chip Seal Sweeping (Scheduled Order)
1. Sherman Rd. between Kochville & Schust in Zilwaukee
2. Schust Rd. between Venoy & Adams in Zilwaukee
3. Adams Rd. between Schust & Tittabawassee in Zilwaukee
4. Sally Ln. between Michigan & Lorraine in Carrollton Twp.
5. Lorraine between Tittabawassee & Savoy in Carrollton Twp.
6. Cadillac Rd. off Savoy in Carrollton Twp.
7. Savoy Rd. between Lorraine & Cadillac in Carrollton Twp.
8. Lorraine Rd. between Schust & Flanders in Carrollton Twp.
9. Baker Rd. between Portsmouth & Reimer in Bridgeport Twp.

Tile Jetting & Videoing Storm Drains on Swan Creek Rd. between Center & Willing in James Twp.

Hot Patching in Frankenmuth Twp.

Surface Maintenance Filling Ruts Using Seal Blend Material)
1. Burt Rd. between Chapin & Merrill in Marion Twp.
2. Baldwin Rd. in Brady Twp.
3. Fenmore Rd in Chapin Twp. & Marion Twp.

Ditch Cleaning on Chapin Rd. between Gratiot & O'Hara in Jonesfield Twp.

Grading Gravel Roads in Brady Twp.

Shoulder Maintenance in Kochville Twp.

Paving Asphalt Patches
1. Chesaning Rd. between East & M-13 in Albee Twp.
2. Frandsche Rd. in Chesaning Twp.

Prepping Previously Crushed Road for Chip Seal on Burt Rd. between M-83 & Block in Birch Run Twp.

Crack Sealing in Slatestone Subdivision off Weiss in Saginaw Twp.

Roadside Mowing in the following Townships: Frankenmuth, Taymouth, Brady, Saginaw, Maple Grove, Jonesfield & Lakefield.

Curb Sweeping - North of M-58 in Saginaw Twp.

Pothole Patching - Countywide

Equipment Maintenance - Servicing & Repairing.

Sign Shop
1. Sign Updating in Spaulding Twp.
2. Clearing from Low Hanging Limbs from Stop Signs in Genesee Gardens Subdivision in Bridgeport Twp.
... See MoreSee Less

2 weeks ago  ·  

View on Facebook

Status for Construction Projects for the week of June 22, 2015

Federal Aid Project – Miller Road Reconstruction - Located between Gratiot Road (M-46) to State Road Sections 13 & 14, 23 & 24 in Thomas Township. Project consists of 1.48 mi of hot mix asphalt surfacing, pavement removal, sub‐base, aggregate base, storm sewer, water‐main, drainage, and concrete drives, curb, gutter, sidewalk and ramps. The remainder of the project to widen North Miller Road from two to three lanes between Gratiot and State Roads resumed construction June 8, 2015. Crews completing water main and water service installation. Road excavation and placement of sand and aggregates bases in the northbound lane underway between Geddes and Chalet. Storm sewer construction to begin from Chalet south next week.
Detour Route schedule for the remaining work is as follows:

2014 – Phase I (between Geddes and State Roads) Construction of Phase I along Miller Road between Geddes and State Roads was completed last fall, except placing top course of asphalt paving & slope restoration, and road was reopened to traffic. Slope restoration has now been completed. Top course of hot mix asphalt paving in this section will be placed in conjunction with Phase II on or about August 25th. All remaining work will be done utilizing Flag Control as needed.

2015 – Phase II (from Gratiot Avenue to Geddes Road)
The existing northbound lane of Miller Road from Gratiot to Geddes will be closed to traffic and construction was begun on June 8. Remaining water main has been installed and now being tested. After testing completed next week services will be installed. Storm sewer and road excavation underway. Traffic will be maintained one way only utilizing the west half of Miller Road until all work is completed on or about August 25. Detour Routes will be in place for southbound traffic until all work for both northbound and southbound lanes are completed on or about August 25. Traffic will be diverted from Miller Road at State Road, then east along State Road to River Road, then south along River Road to Gratiot Avenue, and finally west along Gratiot Avenue back to Miller Road. Upon completion of the northbound lane, construction will begin on the southbound lane on or about July 22. Traffic will continue to be maintained one way only utilizing the east half of Miller Road and the detour route outlined above until all work is completed on or about August 25. Finally, with all other work completed the entire Miller Road project will be reopened for traffic. The top course of asphalt will then be placed over the completed roadway from Gratiot to State utilizing Flag Control. All project work will be complete by August 28, 2015.

Federal Aid Project: Marion Road Surfacing - Located between Fenmore Road and Meridian Road in Section21 & 28 in Marion Twp. Project consists of 1.06 miles of hot mix asphalt base crushing, shaping and resurfacing, trenching ditching, signing and pavement markings. Contract awarded to DJ McQuestion and Sons of Leroy Michigan. The project is scheduled to be open for traffic by August 14, 2015. All remaining project cleanup is to be completed by September 18, 2015. Contractor to mobilize equipment on or about June 24, 2015. Crews will begin ditch cleanout and culvert installation next week. Traffic shall be maintained within the construction influence area throughout the entire duration of construction by use of temporary single lane closures and traffic regulator control.

Federal Aid Project: Gary Road Surfacing Located from Lincoln to Gasper Roads on township line between Albee & Maple Grove Townships. Project consists of 3.08 miles of hot mix asphalt cold milling and resurfacing, aggregate base, minor drainage, guardrail and pavement marking. Contract awarded to Pyramid Paving of Essexville Michigan. Start of construction began Monday June 8, 2015. Contractor is completing ditch cleanout and minor drainage work. Road widening by trenching along both sides of existing pavement to begin this week. The project is to be open to traffic by July 24, 2015. All remaining project cleanup is to be completed by July 31, 2015. Traffic shall be maintained within the construction influence area throughout the entire duration of construction by use of temporary single lane closures and traffic regulator control.

Federal Aid Project: Freeland Road Reconstruction - Located between Lake State Railway tracks to Hwy M‐47 in Tittabawassee Township. Project consists of 0.54 miles of reconstruction including hot mix asphalt pavement, concrete curb & gutter, storm sewer, and earthwork. Contract Awarded to American Excavating of Saginaw Michigan. Construction began June 8, 2015. The project is to be open to traffic by August 28, 2015. All remaining project cleanup is to be completed by November 7, 2015. Storm sewer work under northbound Freeland and westbound Smith Street is underway. Local traffic for on‐site residents is being maintained one way southbound from M‐47. All others must take the detour.

DETOUR ROUTE
Freeland Road shall be closed to through traffic between Midland Road (M‐47) and Webster Road. Traffic shall be detoured via Midland Road (M‐47) and Garfield Road. At least one lane of traffic shall be maintained on Freeland Road at all times for local traffic only.

Federal Aid Project: Wieneke & Shattuck Road Resurfacing - Located along Wieneke Road from Weiss to Shattuck and along Shattuck between Wieneke and Lawndale in Saginaw Township. Description of Work: 0.93 miles of hot asphalt crushing, shaping and resurfacing, concrete curb and gutter, drainage improvements and sidewalk ramps. Contract awarded to Champagne & Marx Excavating of Saginaw Michigan. Start of construction has been delayed due to late delivery of pipe. Pipe is now scheduled for delivery on July 7, 2015. The road closure will be in effect on Monday July 6, 2015. The project is to be open to traffic by September 3, 2015. All remaining project cleanup is to be completed by September 30, 2015. Northbound Wieneke and Lawndale, and westbound Shattuck will be closed during construction. A detour route shall be utilized to maintain this traffic. One lane for southbound and eastbound traffic shall be maintained at all times throughout the construction area.

DETOUR ROUTE
Wieneke Road northbound will be detoured from Wieneke at Weiss along Weiss to Center then north to McCarty Road then west to Hospital Road south back to Weiss. Shattuck Road westbound will be detoured from Shattuck at Center then then north to McCarty Road then west to Hospital Road south back to Shattuck.

Looking Ahead: Federal Aid Projects 2015
1/ Project Name: Gary Road over Shiawassee River Bridge Replacement Location: Between Corunna Road and Sharon Road on the St. Charles/Chesaning township line Letting Date: To be determined, sometime on or before June 19, 2015. Description of Work: Remove & Replace existing with Concrete I‐Beam Structure and Approaches Tentative Construction Schedule: Start work: August 1, 2015. Open to Traffic: December 4, 2015. Final Completion: June 1, 2016.

Looking Ahead: Federal Aid Projects 2015
2/ Project Name: River Road Bank Stabilization Location: Between Frost and Dice Roads in Thomas Township. Letting Date: 07/10/2015 Contractor: To be determined Description of Work: River bank stabilization, concrete curb & gutter, Heavy Riprap and clean up.

Tentative Construction Schedule: Start work no earlier than July 13, 2015, Open to Traffic: on or before August 28, 2015, Final Completion and clean up: on or before November 7, 2015.
... See MoreSee Less